
Stormwater Best Management Practices (BMPs) are implemented as a way of limiting and treating pollutants and
other damaging effects of stormwater runoff in order to meet legislative and North Carolina Administrative Code
requirements. There are two major categories of BMPs: Non-structural and Structural. Non-structural BMPs are
typically passive or programmatic and tend to focus on source control and pollution prevention; reducing pollution in
runoff by reducing the opportunity for the stormwater runoff to be exposed to pollutants. Structural BMPs refer to
physical structures designed to remove pollutants from stormwater runoff, reduce downstream erosion, provide
flood control, and promote groundwater recharge. Structural BMPs typically require engineering design and
engineered construction.
Structural BMP O&M Agreements:Each structural BMP in Apex is required to submit an Operation and Maintenance (O&M) Agreement to the Town prior to final approval.
Click on the appropriate link to view the O&M Agreement for the applicable BMP. An O&M Agreement is a required submittal to the Town prior to Final Plat/Certificate of Occupancy (CO)
Structural BMP Inspection Reports: All BMP owners are responsible for having all BMPs on their property inspected annually by a qualified registered North Carolina professional engineer, land surveyor, or landscape architect performing services only in their area of competence. Each BMP owner will receive a 30-day notice from the Town the month before annual inspection is due. Please contact Public Works at 249-3427 for more information.
Click on the appropriate link to view the Inspection Report for the applicable BMP. A Cover Sheet is required with each Inspection Report submittal.
Local BMP Inspectors: list of local BMP inspectors
Local BMP Contractors: list of local BMP contractors
Watershed Protection Overlay District Map: The Primary Watershed Protection District (red area) is land identified by the State was water supply watershed protected areas. The Secondary Watershed Protection District (orange area) is all other land within the Town and ETJ.
Structural BMP Construction Sequence: This link provides specific information for developers on what is required for BMPs prior to Final Plat/Certificate of Occupancy.